§ 23-10. Compliance required for existing sites.  


Latest version.
  • The terms and conditions of this local law dealing with the maintenance and operation of drilling facilities, shall, where applicable, apply to drilling sites and/or facilities operational prior to the effective date of this local law. Such terms and conditions shall include but shall not be limited to the safeguards set forth herein, together with the fencing requirements contained in § 23-7L: provided, however, that the time period for the installation of any such security fence, as required by the abovementioned section, relative to existing drilling facilities, shall be for a period of 80 days after the effective date of this local law.